Jiangsu Hongbao Group Co., Ltd. 

Manufacture since 1958

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsPrecision Seamless Steel Tubes

Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4

Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4

    • Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4
    • Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4
  • Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4

    Product Details:

    Place of Origin: China
    Brand Name: Hongbao
    Certification: TS16949, ISO9001, OHSAS18001 etc.
    Model Number: HBPST-1

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 ton
    Price: Negotiable
    Packaging Details: Seaworthy Wooden box, customized Packing
    Delivery Time: 30 Days
    Supply Ability: 60000 MT per Year
    Contact Now
    Detailed Product Description
    Application: Automotive Part, Hydraulic System, High-precsion Machining. Etc. Delivery Condition: +C,+LC,+SR,+N,+A
    Standard: EN10305-1, EN10305-4 Port: Shanghai Port
    Payment: T/T; L/C Trade Term: FOB, EXW, CIF

    EN10305-1 EN10305-4 Precision Seamless Steel Tubes For Precision Machinery

    Standard Statement

     

    Material

    Main material: E235,E355,10#,20#,45#,16Mn, ST30Al,ST35, ST37,ST37.4,ST45,ST52,ST52.4,E155,E195,E255, etc

    OD: 4-120mm

    WT: 0.5-15mm

    Standard: EN10305-1, EN10305-4

     

    Advantage of Precision Seamless Steel Tubes

    1. Smaller outer diameters;

    2. High precision can be done in small batch production;

    3. Cold drawing finished products with high precision and good surface quality.

    4. The transverse area of the steel tube is more complicated;

    5. Steel pipe performance is superior, metal is more dense.

     

    Delivery Condition

    Designation Symbol Description
    Cold drawn/ hard +C No heat treatment after the final cold drawig process.
    Cold drawn/ soft +LC No heat treatment after the final cold drawig process.
    Cold draw and stress relieved +SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere.
    Annealed +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
    Normalized +N After the final cold drawing operation the tubes are normalized in a controlled atmosphere.

     

    Surface Treatment:

    Oil-dip.

     

    Machinery Precision Seamless Steel Tubes Nickel White EN10305-1 EN10305-4

    Contact Details
    Jiangsu Hongbao Group Co., Ltd.

    Contact Person: angela zhu

    Send your inquiry directly to us (0 / 3000)

    Other Products