Send Message
Jiangsu Hongbao Group Co., Ltd.
products
products
Home > products > Hollow Steel Tube > Beveled End Hollow Metal Pipe High Precision EN10305-2 For Petroleum Cracking

Beveled End Hollow Metal Pipe High Precision EN10305-2 For Petroleum Cracking

Product Details

Place of Origin: Jiangsu, China

Brand Name: Hongbao

Certification: TS16949,DNV,PED,ISO,TUV,LR

Model Number: HBHST-1

Payment & Shipping Terms

Minimum Order Quantity: 1 ton

Price: Negotiable

Packaging Details: Original packaging according to the customers Export standard package in bundled or as required.

Delivery Time: within 50 days

Supply Ability: 30000MT per year

Get Best Price
Highlight:

hollow steel bar

,

hollow steel pipe

Brand::
Hongbao
Certificate::
TS16949,DNV,PED,ISO,TUV,LR
Material::
ST37.4,ST52.4,E235,E355,26MnB5,34MnB5
OD::
6-120mm
Thickness::
0.5-15mm
Processing::
Cold Drawn, Cold Rolled
Brand::
Hongbao
Certificate::
TS16949,DNV,PED,ISO,TUV,LR
Material::
ST37.4,ST52.4,E235,E355,26MnB5,34MnB5
OD::
6-120mm
Thickness::
0.5-15mm
Processing::
Cold Drawn, Cold Rolled
Beveled End Hollow Metal Pipe High Precision EN10305-2 For Petroleum Cracking

E155,E195,E235,E275,E355 EN10305-2 Hollow Steel Tube Welded Cold drawn Precision Steel Tubes

 

Description:

End Shape

Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's

requirements

Surface

Treatment

Oiled, Galvanized, Phosphate etc
Technique Cold drawn & cold rolled
Application 1. Automotive and mechanical pipes
2. Petroleum cracking pipes
3. High Pressure Boiler Pipe
4. Low and middle pressure fluid transportation pipeline
5. Chemical fertilizer equipment pipes
6. Heat exchanger pipes

Delivery

Conditions

1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper

transformation point in a controlled atmosphere.

Package 1. Bundle Packing.
2. Plain end or vanished as per customer's request.
3. Wrapped in waterproof paper.
4. Sackcloth with several steel strips.
5. Pack in heavy tri-wall boxes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

+C No heat treatment after the final cold drawig process
+LC After the final heat treatment there is a suitable drawing pass
+SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
+A After the final cold drawing process the tubes are annealed in a controlled atmosphere
+N After the final cold drawing operation the tubes are normalized in a controlled atmosphere

 

Testing:

100% PMI,Spectro Chemical Aanlysis Test for Raw Material

100% Dimension & Visual Examination

100% Hydrostatic Test or 100% NON-DESTRUCTIVE Test (ET or UT)

Mechanical Properties Test Include Tension Test,Flaring Test (For Seamless tube/pipe)/ Flange Test (For Welded Pipe & Tube), Hardness Test ,Reversed Flattening Test

Straightness Test