Product Details
Place of Origin: China
Brand Name: Hongbao
Certification: TS16949, ISO9001, OHSAS18001 etc.
Model Number: HB-WT-001
Payment & Shipping Terms
Minimum Order Quantity: 1 ton
Price: Negotiable
Packaging Details: Seaworthy Wooden box, customized Packing
Delivery Time: 30-45 Days
Supply Ability: 60000 MT per Year
Material: |
E355 |
Standard: |
EN10305-2 |
Port: |
Shanghai Port Or As Requirements |
Payment: |
T/T; L/C |
Application: |
Camshaft |
Trade Term: |
FOB, EXW ,CIT Etc. |
Material: |
E355 |
Standard: |
EN10305-2 |
Port: |
Shanghai Port Or As Requirements |
Payment: |
T/T; L/C |
Application: |
Camshaft |
Trade Term: |
FOB, EXW ,CIT Etc. |
High Precision Automotive Steel Tubing , Camshaft Special Welded Steel Pipe
Production Method:
The cold drawn welded tube is produced by drawing ERW (electric resistance welded tube).During this process the sizing (wall thickness, inside and outside diameter), as well as weld integrity and surface finish is closely controlled to produce tube of the required size and mechanical property characteristics.
Main Date
Material: E355
Other Aviliable Material: E155 E195 E235 E275
Outer Diameter Range: 10-50mm
Wall Thickness Range: 1.5-8mm
t/D ≥ 0.2(Normal: t/D=0.1)
Standard: En10305-2
Process: Cold Drawn, Cold Rolling
Typical Specification
Grade |
|
|
|
3 | E355 | Φ38×4.5 | 355~450Mpa |
Chemical Component
Steel Number | Quality Level | Thickness/mm | Deoxidize Method | C(%)≤ | Si(%)≤ | Mn(%)≤ | P(%)≤ | S(%)≤ |
E185(Fe310) | 0 | - | - | - | - | - | - | - |
E235(Fe360) |
A |
≤16 |
N |
0.22 |
- |
- |
0.050 |
0.050 |
E275(Fe430) |
A |
≤40 |
- |
0.24 |
- |
- |
0.050 |
0.050 |
E355(Fe510) |
C |
≤30 |
NE |
0.20 |
0.55 |
1.60 |
0.040 |
0.040 |
Stength Yield
Steel Number | Yield Strengh/MPa | |||||||
≤16 | >16-40 | >40-63 | >63-80 | >80-100 | >100-150 | >150-200 | ||
E185(Fe310) | - | 185 | 175 | - | - | - | - | - |
E235(Fe360) |
A |
235 |
225 |
215 |
215 |
215 |
195 |
185 |
E275(Fe430) |
A |
275 |
265 |
255 |
245 |
235 |
225 |
215 |
E355(Fe510) |
C |
355 |
345 |
335 |
325 |
315 |
295 |
285 |
Delivery Condition:
1) +C No heat treatment after the final cold drawing process.
2) +LC After the final heat treatment there is a suitable drawing pass.
3) +SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere.
4) +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
5) +N After the final cold drawing operation the tubes are normalized in a controlled atmosphere.
Advantage (compare with seamless cold drawn tube)
Better shape
Improved quality surface
Tight Excentricity and wall thickness tolerances (the eccentric
Tube more safety
Good toughness at low temperature
USA Market: 90% of the cylinder in the USA market are produced with welded tubes
Cost fix Lengths More Cheaper
Advantage of Our Company
Top class of welding line: SG/76 Enhanced High-precise High Frequency Welding Tube Production Line. The tube is of small outer diameter (D) and thick wall thickness (t): t/D≥0.2, and high size precision.
Application
Camshaft