Send Message
Jiangsu Hongbao Group Co., Ltd.
products
products
Home > products > Precision Steel Tube > E355 EN10305-2 WT7 Stress Relieved Welded Carbon Steel Pipe Cutting To Specified Length

E355 EN10305-2 WT7 Stress Relieved Welded Carbon Steel Pipe Cutting To Specified Length

Product Details

Place of Origin: Jiangsu, China

Brand Name: Hongbao

Certification: DNV, ISO, TS16949

Model Number: HBPST-1

Payment & Shipping Terms

Minimum Order Quantity: 1 ton

Price: Negotiable

Packaging Details: seaworthy plywooden case packing.

Delivery Time: within 50 days

Payment Terms: L/C, T/T

Get Best Price
Highlight:

precision seamless tubing

,

erw precision tubes

Material::
E355, E235, 26MnB5, 34MnB5
Brand::
Hongbao
Certificate::
ISO, TUV, TS16949
Origin::
Jiangsu, China
Thickness::
0.5-7mm
OD::
6-80mm
Material::
E355, E235, 26MnB5, 34MnB5
Brand::
Hongbao
Certificate::
ISO, TUV, TS16949
Origin::
Jiangsu, China
Thickness::
0.5-7mm
OD::
6-80mm
E355 EN10305-2 WT7 Stress Relieved Welded Carbon Steel Pipe Cutting To Specified Length

EN10305-2 Welded Cold Drawn Carbon Steel Tube For Precision Applications

 

Description:

EN10305-2 welded cold drawn carbon steel tube for precision applications is manufactured through a rigorous process that ensures high strength, precise dimensions, and excellent surface finish. It adheres to strict quality standards for reliability in critical applications.

 

Steel Grade Minimum values for the delivery condition
Steel name Steel number + C + LC + SR + A + N
Rm Mpa A% Rm Mpa A% Rm Mpa ReH Mpa A% ReH Mpa A% Rm Mpa ReH Mpa A%
E215 1.0212 430 8 380 12 380 280 16 280 30 290-430 215 30
E235 1.0308 480 6 420 10 420 350 16 315 25 340-480 235 25
E355 1.0580 640 4 580 7 580 450 10 450 22 490-630 355 2

 

 

Delivery Conditions:

+C Hard. No final treatment after final cold drawing.

+LC Soft. Final heat treatment is followed by a suitable drawing pass (limited reduction of area).

+SR Stress Relieved. After final cold drawing, the tubes are stress relieved in a controlled atmosphere.

+A Annealed. After final cold drawing, the tubes are annealed in a controlled atmosphere.

+N Normalized. After final cold drawing, the tubes are normalized in a controlled atmosphere.

 

Process:

The cold rolled welded tube is produced by drawing ERW (electric resistance welded tube).During this process the sizing (wall thickness, inside and outside diameter), as well as weld integrity and surface finish is closely controlled to produce tube of the required size and mechanical property characteristics.

 

Tube Finishing Options:

Our tubes can be additionally treated to achieve the exact finishes and ends needed by customers. These are some of the additional operations that can be performed on our tube:Drawing, Heat treatment, Bulging, Swaging, Cutting, Deburring, Vibro cleaning, Threading,De-rusting, Chamfering, Washing.

 

Standard AND Optional Testing:

Visual and dimensional test 100%.

Eddy current test 100% acc. to EN 10246-3.

Ultrasonic test 100% acc. to EN 10246-7.

Chemical composition.

Impact test.

E355 EN10305-2 WT7 Stress Relieved Welded Carbon Steel Pipe Cutting To Specified Length 0